Experts propose realistic first steps toward 100 GW solar target

In last Friday's media briefing, two energy experts stressed the need for phased approaches and quick wins to realize the 100 GW solar program targeted for completion before 2029.

IESR CEO Fabby Tumiwa argued that the 100 GW PLTS program must begin with measurable quick wins. He proposed three priority agendas: accelerating dedieselisasi, scaling rooftop solar and Battery Energy Storage Systems, and developing village solar models through cooperatives or BUMDes.

Fabby stated that quick wins are essential to demonstrate the program as a real energy transformation strategy. President Prabowo Subianto had earlier affirmed the government's commitment to accelerate solar development as part of the national energy transition and self-reliance agenda.

Meanwhile University of Indonesia expert Eko Adhi Setiawan suggested starting with a 10 GW pilot project as a proof-of-concept phase. He said this approach is more realistic given human resource readiness and the national solar industry ecosystem before expanding to a larger scale.

相关文章

Indonesian officials overseeing waste site cleanup with May 2028 target banner
AI 生成的图像

Government sets may 2028 target to resolve national waste crisis

由 AI 报道 AI 生成的图像

Coordinating Minister for Food Zulkifli Hasan has set a May 2028 deadline to end open dumping of waste nationwide. The target was announced amid President Prabowo Subianto’s direct attention to a waste crisis that has persisted for decades.

The Ministry of Mines and Energy reported 4.63 GW of installed capacity in solar and renewable projects through July. The Plan 6GW Plus target fell 1.37 GW short.

由 AI 报道

The PM Surya Ghar: Muft Bijli Yojana has installed rooftop solar systems in 40 lakh households so far. The target of 75 lakh households by year-end faces potential delays due to shortages of locally made panels.

The Ministry of Water and Energy announced that a strategy is being prepared to make sustainable and reliable electricity accessible across the country. This was revealed during a workshop on the third phase of the National Electric Access Program.

由 AI 报道

Kenya is in advanced discussions with Karpowership to deploy floating power plants and ease nationwide electricity shortages.

此网站使用 cookie

我们使用 cookie 进行分析以改进我们的网站。阅读我们的 隐私政策 以获取更多信息。
拒绝