Santiago Metro records record failures in escalators and elevators

Santiago Metro faces a high number of damaged units, with 47 elevators and escalators out of service at press time. Engineer Ariel López reported peaks in failures during April and issues with the new Pago Ágil payment system.

In 2025 the system carried more than 660 million passengers. This high demand has accelerated equipment wear. As of May 11 2026, 39 stations showed failures, with Line 5 the most affected.

Ariel López of the Universidad Tecnológica Metropolitana monitored the units and detected 31 damaged escalators on April 29. Several units have been out for weeks, such as an elevator at Universidad de Chile station for 55 days.

Santiago Metro reported it performs maintenance day and night. The company attributed 47 percent of incidents to user misuse. The Ministry of Transport stated that the Pago Ágil system, launched in February, remains in a trial period and inconsistencies such as Error 402 and double charges are being corrected.

Relaterede artikler

Mexico City Metro workers protest safety issues like fractured tracks during strike, impacting 2 million commuters.
Billede genereret af AI

Mexico City Metro workers stage staggered strikes over safety risks

Rapporteret af AI Billede genereret af AI

The National Union of the Collective Transport System Metro of Mexico City began staggered strikes on Monday, April 13, 2026, by not working overtime, leading to the loss of about 800 train runs and affecting nearly 2 million users. Union leader Fernando Espino highlighted severe issues like 7,000 fractured sleepers on Line 1 and lack of major maintenance on 70% of trains. President Claudia Sheinbaum stated there are no reasons for the strike, as resources are being invested in renovations.

Santiago Metro Line 5 service was interrupted between Vicente Valdés and Rodrigo de Araya on June 1 due to a person on the tracks.

Rapporteret af AI

A security guard at Santiago Metro was injured after being attacked with a bladed weapon at Pedro de Valdivia station on Line 1.

Storstockholms Lokaltrafik warns of major risks for continued problems in subway traffic on Monday morning after several days of disruptions.

Rapporteret af AI

A workplace accident at the future museum works in Metro Ventas station yesterday caused a gas pipe to be perforated and forced the evacuation of the area.

Dette websted bruger cookies

Vi bruger cookies til analyse for at forbedre vores side. Læs vores privatlivspolitik for mere information.
Afvis