Environmental group criticizes LNG terminal operation without land power

The German Environmental Aid warns of environmental and safety risks from the permanent operation of the LNG terminal on Rügen without a land power plant. The organization has filed objections against operator Deutsche Regas's application with the relevant authority. An environmental impact assessment for the modified operation is still missing.

The LNG terminal in Mukran on Rügen is at the center of a controversy over its power supply. The German Environmental Aid (DUH) has objected to an application by Deutsche Regas at the State Office for Agriculture and Environment (StALU) Vorpommern. The operator seeks a change permit to run the terminal permanently without its own land power plant, instead generating electricity via onboard ship combustion engines.

"With the now planned operating method, there is a threat of an aggravation of the already high burdens on people and the environment on Rügen. This is unacceptable," warned DUH federal managing director Sascha Müller-Kraenner. The DUH demands a comprehensive and transparent procedure as well as an environmental impact assessment, which is still pending.

The Federal Administrative Court (BVerwG) recently ruled that Regas needs an emissions protection change permit for switching to ship engines. The StALU granted the operator an extension until April 30, 2026, to bypass the land power plant provisionally. Originally, the terminal was to be supplied with land power from a combined heat and power (CHP) plant in Mukran harbor starting early 2025.

Deutsche Regas argues that the retrofitted catalysts on the ship engines result in lower pollutant emissions than a land-based CHP plant. All noise limits are also being met. Whether the land power plant will ultimately be built remains uncertain.

Mga Kaugnay na Artikulo

Family in winter kitchen alarmed by high gas bill, calendar past January deadline, snowy gas meter outside, contrasted with heat pump alternative.
Larawang ginawa ng AI

Natural gas heating becomes cost trap amid delayed law reform

Iniulat ng AI Larawang ginawa ng AI

Natural gas prices are fluctuating wildly, making heating more expensive for households, as the reform of the heating law stalls. Federal Economics Minister Katherina Reiche missed the January deadline for key points, fueling uncertainty. Experts call for stronger promotion of heat pumps as a cheaper alternative.

The commissioning of three wind turbines in the Fehrenbötel wind farm between Wahlstedt and Rickling has been stalled for months. Instead of delivering biogas electricity, the plants are currently only incurring costs. There is hope that the situation will change soon.

Iniulat ng AI

The Trump administration is promoting a long-stalled $44 billion liquefied natural gas pipeline in Alaska, despite environmental concerns and financial risks. Officials handed a 75 percent stake to private firm Glenfarne Group in a no-bid deal, with the state already spending over $600 million. Critics warn of massive emissions and threats to endangered species.

Crude oil leaked from a pipeline near the PCK refinery in Schwedt, Brandenburg. Firefighters estimate at least 200,000 liters spilled due to preparatory work for a safety test. The incident was largely contained after about 2.5 hours.

Iniulat ng AI

In Bad Segeberg, the number of photovoltaic systems and balcony power plants among citizens is rising sharply. This increases the demands on a secure electricity grid. At the same time, the so-called negative hours are becoming more frequent, which could impact the grid and prices.

Ang Masungi Georeserve Foundation Inc. ay nangunguna sa pagtutol sa 603-megawatt wind farm ng Rizal Wind Energy Corporation dahil sa potensyal na pinsala sa watershed at karst landscape. Ayon sa mga tagapangalaga, ang proyekto ay sumasaklaw sa protected areas sa Antipolo at Tanay. Ang DENR ay tumanggi sa kanilang petisyon para sa cease-and-desist order, na nagsasabing compliant ang energy firm.

Iniulat ng AI

Transportadora de Gas Internacional (TGI) and Hocol have signed an agreement to connect the Ballena regasification unit with the offshore Chuchupa field. This development will enable the injection of up to 250 million cubic feet of gas daily into the national system starting January 2027. The deal aims to secure Colombia's natural gas supply and support an orderly energy transition.

 

 

 

Gumagamit ng cookies ang website na ito

Gumagamit kami ng cookies para sa analytics upang mapabuti ang aming site. Basahin ang aming patakaran sa privacy para sa higit pang impormasyon.
Tanggihan