Flooded railway tracks in Pekalongan, Indonesia, stranding a passenger train and commuters amid heavy rain.
Flooded railway tracks in Pekalongan, Indonesia, stranding a passenger train and commuters amid heavy rain.
Imagem gerada por IA

Pekalongan floods cancel 11 trains from Jakarta

Imagem gerada por IA

Floods in Pekalongan, Central Java, have led PT Kereta Api Indonesia to cancel 11 train journeys from Pasar Senen and Gambir stations on Monday. The flooding continues to disrupt rail lines despite partial clearance, to avoid greater delays. Passengers are eligible for full ticket refunds.

Floods hitting Pekalongan due to extreme weather, breached dikes, and high tides have significantly disrupted train operations. On January 19, 2026, PT Kereta Api Indonesia's Daerah Operasi 1 Jakarta canceled 11 train journeys from Pasar Senen and Gambir stations. Manager of Public Relations for KAI Daop 1 Jakarta, Franoto Wibowo, stated, "KAI is canceling several train journeys to avoid greater potential delays if the trips continue." The cancellations include KA 178 Tawang Jaya Premium (departing 06.45 WIB), KA 204 Tegal Bahari (10.40 WIB), KA 7002A Gajayana Tambahan (00.10 WIB), KA 26 Argo Merbabu (06.00 WIB), KA 130B Papandayan (06.35 WIB), KA 50F Purwojaya (07.00 WIB), KA 20 Argo Muria (07.15 WIB), KA 2 Argo Bromo Anggrek (08.20 WIB), KA 138B Parahyangan (09.15 WIB), KA 58F Purwojaya (13.25 WIB), and KA 7004 Sembrani Tambahan (14.45 WIB).

Overall, from January 15 to 18, 2026, KAI recorded 82 passenger train cancellations in Daop 4 Semarang, particularly in Pekalongan, plus 16 freight trains and 76 delays. KAI President Director Bobby Rasyidin explained, "Indeed, the extreme weather in the last 2-3 days has caused cancellations and delays in our train services." Ticket refund values reached Rp3.5 billion for that period, with 18,000 passengers out of 258,000 sold seats requesting refunds.

KAI guarantees 100 percent ticket refunds up to seven days after cancellation via station counters, Contact Center 121, or the Access by KAI app. KAI VP Corporate Communication Anne Purba emphasized, "As a form of responsibility to customers, KAI provides 100 percent ticket refunds in accordance with regulations." Franoto added, "Train travel safety is our top priority." KAI continues monitoring to restore normal operations.

O que as pessoas estão dizendo

Discussions on X highlight frustration among passengers over train cancellations and severe delays due to Pekalongan floods, with complaints about extended travel times, refund processes, and impacts on Jakarta commuter lines. Some criticize the lack of rail flood mitigation and call for government action, while others share visuals of submerged tracks and note full ticket refunds offered by KAI.

Artigos relacionados

KRL Rangkasbitung line train resumes after floods, workers check tracks for safety.
Imagem gerada por IA

KRL Rangkasbitung line resumes after flooding subsides

Reportado por IA Imagem gerada por IA

KAI Commuter confirmed that Rangkasbitung line KRL services resumed on Monday evening after flooding on the Kebayoran-Pondok Ranji track subsided. Operations proceed at limited speed for safety. Prior disruptions included overhead power outage from lightning strike.

PT Kereta Api Indonesia reports that as of February 21, 2026, 1.58 million train tickets for the Lebaran mudik period from March 11 to April 1 have been sold out of 3.87 million total seats. Occupancy stands at 40.87 percent, leaving 2.2 million seats available. The government offers a 30 percent discount for economy trains from March 14 to 29.

Reportado por IA

PT Kereta Api Indonesia has recorded the highest daily passenger volumes for long-distance trains during the 2026 Lebaran return phase. Occupancy exceeded 140 percent over four consecutive days. Long-distance train ticket sales reached 109.1 percent of capacity.

DKI Jakarta's Disaster Mitigation Agency (BPBD) recorded flooding in 55 neighborhoods (RT) across South and West Jakarta due to heavy rain on Monday, May 4, 2026. Three roads were inundated with water levels of 30-120 cm amid rising levels at key monitoring posts reaching Alert 3 status. BPBD deployed personnel for monitoring, pumping, and coordination with other agencies.

Reportado por IA

Transport Minister Dudy Purwagandhi urged returnees to avoid peak Lebaran traffic on March 24, 28, and 29, 2026, by using work from anywhere (WFA) on March 25-27. One-way national traffic engineering started on March 24 from Kalikangkung Toll Gate to Cikampek Utama.

quinta-feira, 30 de abril de 2026, 10:29h

12 long-distance trains stop at Jatinegara on Labor Day

quarta-feira, 29 de abril de 2026, 14:49h

KAI CEO offers condolences to Bekasi Timur crash victims' families

terça-feira, 28 de abril de 2026, 17:07h

Danantara to start railway electrification groundbreaking on May 20

segunda-feira, 27 de abril de 2026, 02:28h

Train collision in East Bekasi kills six KRL passengers

terça-feira, 21 de abril de 2026, 06:26h

KAI announces strict sanctions for train harassers

sábado, 28 de março de 2026, 06:08h

Public works ministry plans 1,000 temporary homes for railway residents

quinta-feira, 26 de março de 2026, 21:54h

Vehicle volume towards Jakarta rises at Cikampek Utama toll gate during discount

quarta-feira, 25 de março de 2026, 07:39h

Lebaran 2026 return flow busy, 89,000 vehicles cross to Java

terça-feira, 24 de março de 2026, 05:23h

Transjakarta and Mikrotrans to run 24 hours for Lebaran return peak

quarta-feira, 25 de fevereiro de 2026, 08:01h

Korean Air and Philippine Airlines cancel seven flights from South Korea

Este site usa cookies

Usamos cookies para análise para melhorar nosso site. Leia nossa política de privacidade para mais informações.
Recusar