Robe town completes first phase of corridor development

Robe town in Oromia region has completed the first phase of its 12-kilometer corridor development project. Mayor Dino Amin said the work is giving the town a new look to better host visitors. Construction on the second phase covering more than three kilometers is now underway.

The corridor features bicycle and pedestrian paths, street lights, and green spaces. Telecommunications, water, and electricity services are integrated into the system.

Residents said the project has changed work culture in the town and enabled institutions to operate at night. They also noted strong community involvement in the effort.

The mayor added that beyond modernizing the town, the development has improved living conditions for local people.

Artigos relacionados

Prime Minister Abiy Ahmed cutting a ribbon at the Entoto Qebenna riverbank development inauguration, with Mayor Adanech Abiebie and a crowd.
Imagem gerada por IA

Prime Minister Abiy Inaugurates Entoto Qebenna River Development Project

Reportado por IA Imagem gerada por IA

Prime Minister Abiy Ahmed inaugurated the Entoto Qebenna River and riverbank development project today. Mayor Adanech Abiebie said the project enhances the city's beauty.

The Amhara Region Urban and Infrastructure Bureau announced that corridor development work is underway in 43 towns in the region. Bureau head Dr. Mola Melkamu said the efforts are transforming the towns into comfortable destinations for work, living and tourism.

Reportado por IA

Addis Ababa city administration mayor Adanech Abiebie inspected third-round corridor development works. The 13.4-kilometer projects across five routes proceed with quality and speed.

The Harari region culture, heritage and tourism bureau has carried out multiple projects to develop and preserve historic sites and increase tourism benefits.

Reportado por IA

Afar Regional State Chief Administrator Ato Awel Arba said the government is working with special focus and commitment to improve the community's overall beneficiary status and lifestyle.

The long-interrupted construction of the 392-kilometre Awash Kombolcha Hara Gebeya railway project has resumed in Ethiopia.

Reportado por IA

A modern power distribution station built in Werabe town at a cost of 640 million birr was inaugurated today.

segunda-feira, 22 de junho de 2026, 19:40h

Ethiopia corridor development transforms cities for residents

quarta-feira, 17 de junho de 2026, 11:50h

Addis Ababa Mayor outlines 90-day plan to address public concerns

sábado, 23 de maio de 2026, 03:39h

Addis Ababa mayor highlights five years of development revolution

quinta-feira, 21 de maio de 2026, 04:33h

Integrated urban agriculture center opens in Lemi Kura sub-city

quarta-feira, 13 de maio de 2026, 11:56h

Rural corridor development transforms lifestyles in Gondar

quinta-feira, 07 de maio de 2026, 03:55h

Oromia community benefit projects enter service

quinta-feira, 30 de abril de 2026, 23:18h

Rural corridor development launches in Arsi and Arsi-Boricha zones

quinta-feira, 30 de abril de 2026, 13:11h

Infrastructure projects listed to boost created community usability

quinta-feira, 23 de abril de 2026, 00:15h

Addis Ababa transforms river gorges into safe residential areas

sábado, 11 de abril de 2026, 17:10h

Ahmed Shide urges intensified funding for future road corridors

 

 

 

Este site usa cookies

Usamos cookies para análise para melhorar nosso site. Leia nossa política de privacidade para mais informações.
Recusar