New Calle 26 TransMilenio station starts operations in Bogotá

On Saturday, December 27, the new Calle 26 TransMilenio station on the Caracas Centro trunk line began operations after 19 months of construction linked to the Bogotá Metro Line 1 works. In its first phase, the north access opened, benefiting over 11,000 daily users in the International Center area.

The Calle 26 station, located on Avenida Caracas, marks a key step in integrating Bogotá's mass transit system. Built as part of the Bogotá Metro Line 1 works, this definitive infrastructure began partial operations on December 27, 2025.

In the initial phase, only the north access, corresponding to wagon 2, was enabled, with entry from the north side at the height of Calle 28. The south access, or wagon 1, will activate in the first half of 2026, once Metro viaduct works over Avenida El Dorado are completed.

During a tour of the station, Bogotá's mayor, Carlos Fernando Galán, highlighted its significance: “Starting today, the north wagon of the Calle 26 station comes into operation, a station with greater capacity, more space, and better services, which will allow us to continue integrating Bogotá's transport system between TransMilenio and Metro Line 1”.

TransMilenio's general manager, María Fernanda Ortiz, outlined the gradual rollout: “We are starting operations at the new Calle 26 station with the north access, which will benefit more than 11,000 users per day. Progressively, we will recover the system's capacity on Avenida Caracas, which has seen adjustments to facilitate the progress of the Bogotá Metro Line 1 works”.

Designed to integrate with the Metro viaduct's portal structure, the station features two 60-meter wagons connected by a central walkway, totaling over 163 meters in length. It provides an eight-meter width and 3.2-meter interior height, enhancing user comfort and flow. It includes 12 full-height access barriers, including options for reduced mobility, a north-side ticket booth, and six stopping points, three per direction. Viaduct columns are positioned on the sides, avoiding interference with passenger movement.

Services stopping there include Ruta Fácil 8, H20, D20, H27, and B27, linking to portals such as Usme, Tunal, 80, and Norte, plus the NQS Central trunk via Calle Sexta. This opening eases system pressures and promises improved urban connectivity.

Makala yanayohusiana

President Sheinbaum cuts ribbon at inauguration of Mexico-Toluca 'El Insurgente' train after 12 years, crowd celebrates new 58km commuter line.
Picha iliyoundwa na AI

Mexico-Toluca train completes operations after 12 years of construction

Imeripotiwa na AI Picha iliyoundwa na AI

President Claudia Sheinbaum inaugurated on February 2, 2026, the final stage of the Mexico-Toluca Interurban Train, known as 'El Insurgente', a project started in 2014 with a 100 billion peso investment. This 57.7-kilometer line connects Toluca to western Mexico City, serving over 230,000 daily passengers. The project features seven stations and links to the Metro and Cablebús systems.

The Bogotá Metro project has advanced to over 70% completion as of early 2026, including a key milestone of 10 kilometers of viaduct constructed. Mayor Carlos Fernando Galán highlighted this progress, alongside the ongoing dynamic tests in the Bosa workshop, as the project enters its final stretch.

Imeripotiwa na AI

Bogotá's Instituto de Desarrollo Urbano (IDU) reported that the TransMilenio depressed passage at the intersection of Calle 100 and Avenida Suba has reached 66% completion. This underground structure aims to enhance mobility in the capital, with ongoing work on concrete screens and key structural elements. The project includes public spaces and green areas for the benefit of residents.

Bogotá's mayor's office announced the opening of the new south sidewalk of Calle 45, between Carrera Séptima and Carrera Quinta, in Chapinero locality. The project adds over 2,000 square meters of public space and aims to enhance safety for pedestrians and residents. Multiple agencies collaborated to finish the work.

Imeripotiwa na AI

Chinese companies have shown interest in bidding for Bogotá's Metro Line 2, as confirmed by the head of the Colombia-China Business Association. This follows the lack of offers for construction in January. Line 1 is 72% complete and expected to operate in 2028.

São Paulo's Line 17-Ouro monotrilho was inaugurated on March 31, 2026, linking Morumbi station to Congonhas Airport in the south zone, 12 years late from its 2014 World Cup promise. Folha tests found bus and ride-hailing car faster than metro from Sé Square to the airport. Governor Tarcísio de Freitas announced an extension to Paraisópolis.

Imeripotiwa na AI

The National Police, along with the Mayor's Office and Metro de Cali, has implemented a security plan in the MIO mass transit system to prevent crimes. In 2025, thefts against people decreased by 41%, from 1,100 to around 670 cases. Over 300,000 people use the system daily, with authorities focusing efforts on key points.

Jumatano, 18. Mwezi wa tatu 2026, 14:18:24

Metro achieves tunnel meeting for Line 7 at Cal y Canto

Ijumaa, 13. Mwezi wa tatu 2026, 04:01:14

ANI confirms conditions to start Accesos Norte Phase II construction

Jumatatu, 9. Mwezi wa tatu 2026, 17:43:14

Commercial operation starts for La Dorada-Chiriguaná railway corridor

Jumapili, 22. Mwezi wa pili 2026, 04:57:16

Idu confirms 80% progress on group 9 of avenue 68

Ijumaa, 6. Mwezi wa pili 2026, 07:06:43

Mexico City Metro Line 2 starts remodeling works on February 9

Jumamosi, 31. Mwezi wa kwanza 2026, 06:14:30

Urban cable cars advance in Latin America in 2026

Jumanne, 20. Mwezi wa kwanza 2026, 23:52:36

No proposals received for Bogotá metro line 2 construction

Jumamosi, 10. Mwezi wa kwanza 2026, 09:19:44

Fourth train arrives from China for Bogotá Metro Line 1 tests

Ijumaa, 9. Mwezi wa kwanza 2026, 00:37:31

Partial closures on Mexico City Metro Line B this weekend

Alhamisi, 1. Mwezi wa kwanza 2026, 10:06:47

Bogotá's mayor's office proposes $350 TransMilenio fare increase

 

 

 

Tovuti hii inatumia vidakuzi

Tunatumia vidakuzi kwa uchambuzi ili kuboresha tovuti yetu. Soma sera ya faragha yetu kwa maelezo zaidi.
Kataa