Chennai Metro tunnelling from Thiruvanmiyur to Taramani delayed until June

Chennai Metro Rail's phase II tunnelling from Thiruvanmiyur to Taramani has been delayed until June due to a snag in the tunnel boring machine (TBM). The affected section is part of corridor 5 from Madhavaram to Sholinganallur.

Chennai Metro Rail's phase II project has hit a snag in tunnelling work between Thiruvanmiyur and Taramani due to a technical issue with the tunnel boring machine (TBM), delaying progress until June, as reported by The Hindu.

The 118.9-km phase II network comprises three corridors: corridor 3 from Madhavaram to SIPCOT, corridor 4 from Poonamallee to Light House, and corridor 5 from Madhavaram to Sholinganallur. The delayed section falls under corridor 5.

Construction of both elevated and underground structures has been ongoing for a couple of years. The Chennai Metro Rail Limited (CMRL) aims to enhance the city's transport infrastructure through this expansion.

Artikel Terkait

Cutaway view of approved underground tunnel linking Nashville downtown to airport, with Governor Bill Lee announcing the project and Tesla vehicles inside.
Gambar dihasilkan oleh AI

Tennessee menyetujui terowongan bawah tanah untuk penghubung bandara Nashville

Dilaporkan oleh AI Gambar dihasilkan oleh AI

Gubernur Bill Lee mengumumkan persetujuan untuk proyek Music City Loop milik The Boring Company, sebuah terowongan bawah tanah yang menghubungkan pusat kota Nashville dengan bandara internasional. Inisiatif yang didanai secara pribadi ini, menggunakan kendaraan Tesla, bertujuan mengurangi waktu perjalanan menjadi sekitar delapan menit. Konstruksi akan dimulai segera setelah izin dari Departemen Transportasi Tennessee dan Administrasi Jalan Raya Federal.

Chennai Metro Rail has completed construction of 26 deck slabs in the Porur to Vadapalani section of corridor 4 under the upcoming phase II project, a key requirement for train services. This forms part of the first stretch from Poonamallee to Vadapalani via Porur, originally scheduled to open to the public in February but postponed.

Dilaporkan oleh AI

The Bhopal Metro Rail project was formally inaugurated on Saturday, with Chief Minister Mohan Yadav and Union Minister Manohar Lal Khattar flagging off services on a 6.22-km stretch of the Orange Line. This priority corridor runs across eight elevated stations from Subhash Nagar to AIIMS Bhopal, with commercial operations beginning on December 21. Designed to ease congestion on the state capital's busiest roads, it offers a cleaner mass-transit alternative in a city reliant on road transport.

Bogotá's Instituto de Desarrollo Urbano (Idu) announced that group 9 of avenue 68 has reached 80% progress, up from 32% in January. This 2.23 km section will enter its final phase this year, according to director Orlando Molano. The project includes lanes for TransMilenio and improvements to public spaces.

Dilaporkan oleh AI

As part of the ongoing rehabilitation of Mexico City Metro Line 2 for the 2026 World Cup—first announced in February—changes at Tasqueña station began on April 2. The south platform is out of service for floor replacement, with the north platform handling all boarding and alighting. Closures or restrictions also affected Viaducto, Chabacano, and San Antonio Abad stations amid Holy Week scheduling.

Santiago Metro achieved the tunnel meeting at Cal y Canto station for Line 7 on Wednesday, a milestone in the 26-kilometer mega project. The station, at 60% progress, will be the first quadruple interchange with lines L2, L3, L7, and future L9, linking Renca to Vitacura in 37 minutes.

Dilaporkan oleh AI

Bogotá's mayor, Carlos Fernando Galán, announced that no proposals were received for the construction of metro line 2 along calle 72 after the deadline. However, the district administration assured that the works will not stop and will launch an international public tender in February. Proposals are expected in September, with construction starting in 2027.

 

 

 

Situs web ini menggunakan cookie

Kami menggunakan cookie untuk analisis guna meningkatkan situs kami. Baca kebijakan privasi kami untuk informasi lebih lanjut.
Tolak