Chennai Metro tunnelling from Thiruvanmiyur to Taramani delayed until June

Chennai Metro Rail's phase II tunnelling from Thiruvanmiyur to Taramani has been delayed until June due to a snag in the tunnel boring machine (TBM). The affected section is part of corridor 5 from Madhavaram to Sholinganallur.

Chennai Metro Rail's phase II project has hit a snag in tunnelling work between Thiruvanmiyur and Taramani due to a technical issue with the tunnel boring machine (TBM), delaying progress until June, as reported by The Hindu.

The 118.9-km phase II network comprises three corridors: corridor 3 from Madhavaram to SIPCOT, corridor 4 from Poonamallee to Light House, and corridor 5 from Madhavaram to Sholinganallur. The delayed section falls under corridor 5.

Construction of both elevated and underground structures has been ongoing for a couple of years. The Chennai Metro Rail Limited (CMRL) aims to enhance the city's transport infrastructure through this expansion.

Artigos relacionados

Cutaway view of approved underground tunnel linking Nashville downtown to airport, with Governor Bill Lee announcing the project and Tesla vehicles inside.
Imagem gerada por IA

Tennessee aprova túnel subterrâneo para ligação ao aeroporto de Nashville

Reportado por IA Imagem gerada por IA

O governador Bill Lee anunciou a aprovação do projeto Music City Loop da The Boring Company, um túnel subterrâneo que liga o centro de Nashville ao aeroporto internacional. A iniciativa financiada privadamente, utilizando veículos Tesla, visa reduzir os tempos de deslocação para cerca de oito minutos. A construção deve começar imediatamente após a licença do Departamento de Transportes do Tennessee e da Administração Federal de Estradas Rodoviárias.

Chennai Metro Rail has completed construction of 26 deck slabs in the Porur to Vadapalani section of corridor 4 under the upcoming phase II project, a key requirement for train services. This forms part of the first stretch from Poonamallee to Vadapalani via Porur, originally scheduled to open to the public in February but postponed.

Reportado por IA

The Bhopal Metro Rail project was formally inaugurated on Saturday, with Chief Minister Mohan Yadav and Union Minister Manohar Lal Khattar flagging off services on a 6.22-km stretch of the Orange Line. This priority corridor runs across eight elevated stations from Subhash Nagar to AIIMS Bhopal, with commercial operations beginning on December 21. Designed to ease congestion on the state capital's busiest roads, it offers a cleaner mass-transit alternative in a city reliant on road transport.

O Instituto de Desenvolvimento Urbano (Idu) de Bogotá anunciou que o grupo 9 da avenida 68 alcançou 80% de progresso, contra 32% em janeiro. Esta seção de 2,23 km entrará em sua fase final este ano, segundo o diretor Orlando Molano. O projeto inclui faixas para TransMilenio e melhorias nos espaços públicos.

Reportado por IA

Como parte da reabilitação em curso da Linha 2 do Metrô da Cidade do México para a Copa do Mundo de 2026 — anunciada inicialmente em fevereiro —, as mudanças na estação Tasqueña começaram em 2 de abril. A plataforma sul está fora de serviço para substituição do piso, com a plataforma norte operando todo o embarque e desembarque. Fechamentos ou restrições também afetaram as estações Viaducto, Chabacano e San Antonio Abad durante a programação da Semana Santa.

O Metrô de Santiago alcançou o encontro do túnel na estação Cal y Canto para a Linha 7 na quarta-feira, um marco no megaprojeto de 26 quilômetros. A estação, com 60% de progresso, será o primeiro intercâmbio quádruplo com as linhas L2, L3, L7 e a futura L9, ligando Renca a Vitacura em 37 minutos.

Reportado por IA

O prefeito de Bogotá, Carlos Fernando Galán, anunciou que nenhuma proposta foi recebida para a construção da linha 2 do metrô ao longo da calle 72 após o prazo. No entanto, a administração distrital garantiu que as obras não pararão e lançará uma licitação pública internacional em fevereiro. Propostas são esperadas em setembro, com construção iniciando em 2027.

 

 

 

Este site usa cookies

Usamos cookies para análise para melhorar nosso site. Leia nossa política de privacidade para mais informações.
Recusar