News illustration showing utility workers cutting power to Lake Tahoe area residents amid energy supply changes.
News illustration showing utility workers cutting power to Lake Tahoe area residents amid energy supply changes.
Gambar dihasilkan oleh AI

Perusahaan listrik Nevada akan menghentikan pasokan listrik ke penduduk Danau Tahoe pada 2027

Gambar dihasilkan oleh AI

Sebuah perusahaan energi yang berbasis di Nevada berencana untuk berhenti menyuplai listrik kepada sekitar 49.000 penduduk di dekat Danau Tahoe pada Mei 2027. Langkah ini membuat penyedia layanan lokal di California harus bergegas mencari pengganti di tengah meningkatnya permintaan dari pusat data.

Liberty Utilities, yang melayani wilayah Danau Tahoe di sisi California, saat ini mendapatkan 75 persen pasokannya dari NV Energy. Perusahaan listrik Nevada tersebut telah memberi tahu Liberty bahwa mereka akan mengakhiri perjanjian tersebut pada Mei 2027 guna mengosongkan kapasitas untuk proyek pusat data baru di Nevada utara.

Apa yang dikatakan orang

Para pengguna mengungkapkan rasa frustrasi terhadap keputusan NV Energy yang mengalihkan listrik dari penduduk Danau Tahoe untuk pusat data, dengan kekhawatiran bahwa permintaan yang didorong oleh kecerdasan buatan (AI) akan berdampak pada pasokan lokal serta adanya seruan untuk melakukan perubahan regulasi.

Artikel Terkait

Tesla Energy substation in UK countryside with Ofgem licence sign, illustrating entry into Great Britain electricity market.
Gambar dihasilkan oleh AI

Tesla secures Ofgem licence to supply electricity in Great Britain

Dilaporkan oleh AI Gambar dihasilkan oleh AI

Tesla Energy Ventures has received approval from the UK energy regulator Ofgem to supply electricity to households and businesses across England, Scotland, and Wales. The licence, effective from March 11, 2026, allows the company to replicate its Texas electricity model despite public opposition linked to Elon Musk's political activities. This marks a key step in Tesla's expansion into the UK energy market after years of building infrastructure.

Tesla is constructing a $250 million battery energy storage system using Megapack units in Reno, Nevada. The facility will include 256 units arranged in 16 clusters. Sawyer Merritt first reported the project on April 3, 2026.

Dilaporkan oleh AI

The Tennessee Valley Authority's board voted unanimously to extend the life of two coal plants and drop renewable energy as a priority during a February meeting. This decision follows the appointment of new members by President Trump and comes amid rising electricity demand from data centers. Critics argue it erodes the utility's environmental mission and bypasses public input.

Tesla, Google, and Carrier have formed the Utilize coalition with other companies to improve U.S. power grid utilization and potentially save consumers over $100 billion in the next decade. The group highlights that the grid operates at only 53% capacity on average, leading to higher electricity costs. Founding members aim to advocate for policies that unlock idle capacity through technologies like battery storage and virtual power plants.

Dilaporkan oleh AI

Ratepayers of the Salt River Project in Arizona will vote on Tuesday for half of the utility's 14 board seats, in a contest between clean energy advocates and pro-fossil fuel backers. The election could shift control toward more solar, batteries and nuclear power amid rising demand from data centers and growth. The unique one-acre-one-vote system limits participation to landowners.

Cuba's National Electric System (SEN) suffered a total disconnection on Monday, March 16, 2026, the sixth nationwide blackout in the last 18 months. The state-run Electric Company (UNE) reported the outage and activated emergency protocols to restore service.

Dilaporkan oleh AI

Meta has agreed to fund seven new natural gas power plants and extensive energy infrastructure to support its largest data center under construction in Richland Parish, Louisiana. The deal with Entergy Louisiana includes 240 miles of transmission lines and battery storage, as reported by the Wall Street Journal. This follows a non-binding pledge by tech companies to cover power costs for AI data centers.

 

 

 

Situs web ini menggunakan cookie

Kami menggunakan cookie untuk analisis guna meningkatkan situs kami. Baca kebijakan privasi kami untuk informasi lebih lanjut.
Tolak