Batu-Negelle Arsi expressway construction reaches 99% progress

The Batu-Negelle Arsi expressway, part of the Moyo Hawassa development project, is being constructed at a cost of 5 billion 39 million Birr and has reached 99% progress. This project forms part of the Addis Ababa-Moyo-Moyale-Lamu-Mombasa Trans International Highway.

Addis Ababa, March 5, 2026 (FBC) – The Ethiopian Roads Authority has stated that the Batu-Negelle Arsi expressway, part 3 of the Moyo Hawassa development project, is progressing under construction.

According to Engineer Defaru Derese, leader of the Moyo Hawassa construction projects department at the authority, the project is being built at a cost of 5 billion 39 million Birr and has achieved 99% progress. The road measures 57 kilometers 4 meters in length and 31 meters 6 centimeters in width.

The funding for the project comes from the World Bank, with construction handled by the China Communication Construction Company. This initiative aims to halve travel times and serves as a segment of the Addis Ababa-Moyo-Moyale-Lamu-Mombasa Trans International Highway. Additionally, it forms part of the 10,000-kilometer Eastern Africa Corridor.

The project is expected to provide significant dividends for the region's economic and social development. In particular, by reducing transportation costs, it will create opportunities for tourism growth.

Artigos relacionados

Ethiopian leaders Abiy Ahmed, Temesgen Tiruneh, Shumelis Abdisa, and Eyob Tekalgn inaugurate Busa Gonofa food complex and Geter Corridor in Wellega, Oromia.
Imagem gerada por IA

Officials inaugurate development projects in Wellega region

Reportado por IA Imagem gerada por IA

Ethiopian Prime Minister Abiy Ahmed, Deputy Prime Minister Temesgen Tiruneh, Oromia President Shumelis Abdisa, and National Bank Governor Eyob Tekalgn visited development works and inaugurated projects in Wellega zones of Oromia region on the same day. Projects including the Busa Gonofa integrated food industry complex and Geter Corridor development were highlighted as key for agro-industry, job creation, and economic growth.

Kenya's Transport Cabinet Secretary Davis Chirchir has confirmed that construction is underway on 25 kilometers of the Rironi-Mau Summit Highway. The project, launched by President William Ruto in November 2025, aims to modernize key routes connecting Nairobi to western Kenya and East African neighbors.

Reportado por IA

Egypt's Minister of Transport, Kamel Al-Wazir, inspected ongoing upgrades to a 64-kilometre stretch of the International Coastal Road between Damietta and Baltim. This visit forms part of a broader initiative to develop the full 800-kilometre route from Port Said to Salloum.

Deputy Prime Minister for Industrial Development and Minister of Industry and Transport Kamel Al-Wazir conducted an extensive inspection tour to review progress on Egypt's first high-speed train line. The tour focused on the section from 6th of October City to Borg El Arab, emphasizing station construction and civil works. The 660-kilometer line forms a key part of the Sokhna-Dekheila integrated logistics corridor.

Reportado por IA

Addis Ababa's mayor Adanech Abiebie states that the city's 24-hour work format corridor development projects are advancing quickly. Drawing from social media messages, workers in various areas are laboring with determination, contributing to the city's growth through their efforts and national pride. The administration has expressed gratitude and mobilized resources to support them.

KeNHA especificou detalhes das propostas para o asfaltamento das estradas Kandwia-Kyuso e Kyuso-Tseikuru até a casa de Mwingi North do líder do Wiper Kalonzo Musyoka, após o anúncio da semana passada e sua revelação de recusa passada a melhorias direcionadas.

Reportado por IA

O deputado de Nandi Hills, Bernard Kitur, solicitou uma declaração oficial do Ministério das Estradas e Transportes sobre os atrasos na expansão da estrada Eldoret-Shamahoho, que resultaram em numerosos acidentes fatais. Projetada no final dos anos 1960, a estrada não consegue mais lidar com o aumento do tráfego entre o North Rift e as regiões ocidentais. O deputado pede medidas de segurança imediatas e prazos claros para a atualização.

quarta-feira, 04 de março de 2026, 02:14h

Ethiopia's 9th infrastructure week begins

domingo, 22 de fevereiro de 2026, 04:57h

Idu confirma 80% de progresso no grupo 9 da avenida 68

sexta-feira, 20 de fevereiro de 2026, 16:49h

2.4 billion birr project electrifies 21 new towns in Afar

quarta-feira, 14 de janeiro de 2026, 09:31h

Ethiopian Airlines to pick lead contractor for Bishoftu project in June

terça-feira, 06 de janeiro de 2026, 13:20h

Primeiros contratos assinados para concessões de rotas do corredor Mercosul

sexta-feira, 02 de janeiro de 2026, 18:34h

Presidente Ruto lança grandes projetos em 2025

sábado, 27 de dezembro de 2025, 07:14h

Kura vai gastar 1,6 mil milhões de Ksh na reabilitação da State House Road

terça-feira, 23 de dezembro de 2025, 02:59h

KeNHA anuncia melhoria da estrada Kyuso-Tseikuru em Kitui

segunda-feira, 15 de dezembro de 2025, 07:56h

Harari leader inspects sustainable global corridor project

sábado, 13 de dezembro de 2025, 01:44h

Presidente Ruto anuncia autoestrada Nairobi-Thika para 2026

 

 

 

Este site usa cookies

Usamos cookies para análise para melhorar nosso site. Leia nossa política de privacidade para mais informações.
Recusar