NASA starts countdown rehearsal for Artemis II moon mission

NASA has begun a critical two-day wet dress rehearsal for the Artemis II mission at Kennedy Space Center, simulating launch procedures without engine ignition. The test involves loading the Space Launch System rocket with over 700,000 gallons of propellant and could pave the way for a crewed launch as early as February 8. This marks preparation for the first human trip beyond low Earth orbit since 1972.

In the early hours of a cold February Sunday morning, a full moon illuminated NASA's Space Launch System (SLS) rocket at Kennedy Space Center as teams initiated the wet dress rehearsal for Artemis II. This practice countdown replicates every launch day step except engine ignition, including the loading of more than 700,000 gallons of super-cold liquid hydrogen and liquid oxygen propellant. The 322-foot-tall SLS rolled out to the launch pad two weeks prior, and engineers are conducting final checks amid challenges from a recent deep freeze that delayed the test by two days. Adaptations include adding heaters to the Orion capsule and adjusting rocket purge systems.

If successful, the rehearsal could enable a launch attempt by February 8, within a tight window constrained by orbital mechanics and weather; otherwise, the mission must wait until later in the year, no later than February 11. Meanwhile, the Artemis II crew—Commander Reid Wiseman, Pilot Victor Glover, and Mission Specialists Christina Koch and Jeremy Hansen—is in quarantine at NASA's Johnson Space Center in Houston since late January to avoid health risks. The astronauts, who have trained together since 2023 in simulators, T-38 jets, and mission control tests, will monitor the rehearsal remotely before heading to Florida if cleared.

Artemis II will send the crew on a 10-day free-return trajectory around the Moon in the Orion capsule, named Integrity, passing about 6,400 miles beyond the lunar far side before splashing down in the Pacific Ocean. It is the first crewed mission beyond low Earth orbit since Apollo 17 in 1972. Wiseman, on his second spaceflight, described the mission as shifting exploration from memory to lived experience: “In our lifetime, we’ve looked at the Moon knowing that people had been there. And now in the Artemis generation, kids will walk out and look at the Moon going, we are there.” Glover emphasized humanity's exploratory drive: “Pushing ourselves to explore is just core to who we are.” Koch added, “From the time humans started exploring, this was always in our future and in our fate. We were always going to the Moon.”

The mission advances NASA's goals for sustained lunar presence and eventual Mars exploration, representing a technical and generational milestone. Koch returns after setting a women's record for longest single spaceflight, while Hansen becomes the first Canadian on a lunar mission.

ተያያዥ ጽሁፎች

NASA Administrator Jared Isaacman announces delay of first human moon landing to Artemis IV in 2028 during press conference.
በ AI የተሰራ ምስል

NASA delays moon landing to Artemis IV in 2028

በAI የተዘገበ በ AI የተሰራ ምስል

NASA has overhauled its Artemis program, postponing the first human moon landing until the Artemis IV mission in early 2028. The changes, announced by Administrator Jared Isaacman on February 27, 2026, aim to increase launch frequency and reduce risks after repeated delays with the Space Launch System rocket. An additional test flight, now Artemis III, will focus on low-Earth orbit rendezvous with commercial lunar landers.

NASA has set March 6 as the earliest possible launch date for the Artemis II mission following a successful second fueling test of its Space Launch System rocket. The test at Kennedy Space Center resolved issues from an earlier attempt marred by a hydrogen leak. The mission will send four astronauts around the Moon in a crewed test of the Orion spacecraft.

በAI የተዘገበ

NASA's Artemis II mission has advanced as its Space Launch System rocket and Orion spacecraft arrived at Launch Pad 39B at Kennedy Space Center. The overnight rollout marks a crucial step toward the first crewed Artemis flight, set to orbit the Moon. Engineers now prepare for prelaunch tests ahead of sending four astronauts on a 10-day journey.

NASA's new administrator, Jared Isaacman, has voiced complete trust in the Orion spacecraft's heat shield ahead of the Artemis II mission. Following a detailed review with experts, he affirmed the agency's plan to proceed with the existing shield after addressing concerns from the Artemis I flight. This decision comes just weeks before the crewed lunar mission's potential launch in early February 2026.

በAI የተዘገበ

The four astronauts assigned to NASA's SpaceX Crew-12 mission have started a two-week quarantine at the Johnson Space Center in Houston to safeguard their health before launch. The crew, comprising members from NASA, the European Space Agency, and Roscosmos, is preparing for a flight to the International Space Station scheduled no earlier than February 11. This mission highlights ongoing international collaboration in space exploration.

China has successfully completed a crucial safety test for its Mengzhou spacecraft, a major step in preparations for a crewed moon mission by 2030. The test featured the first flight of the Long March-10 rocket from Hainan. The uncrewed vessel separated shortly after launch and splashed down in the ocean at its designated spot.

በAI የተዘገበ

A Crew Dragon spacecraft docked with the International Space Station on Valentine’s Day, bringing four new astronauts and restoring NASA's full complement in orbit. The arrival followed an early return of a Crew-11 member due to a health emergency, leaving a single NASA astronaut to manage operations alone for over a month. The new crew members are Jessica Meir and Jack Hathaway from NASA, Sophie Adenot from the European Space Agency, and Andrey Fedyaev from Roscosmos.

 

 

 

ይህ ድረ-ገጽ ኩኪዎችን ይጠቀማል

የእኛን ጣቢያ ለማሻሻል ለትንታኔ ኩኪዎችን እንጠቀማለን። የእኛን የሚስጥር ፖሊሲ አንብቡ የሚስጥር ፖሊሲ ለተጨማሪ መረጃ።
ውድቅ አድርግ