JKIA's Terminal 1E to close, private cars restricted in upgrade plan

Jomo Kenyatta International Airport's Terminal 1E is set to close to allow expansion of Terminal 1D. Private cars will be barred from the main terminal area, with drop-offs and pickups redirected to near the long-term car park. This initial phase aims to ease pressure and boost capacity to 12 million passengers annually.

Temporary parking spaces and Terminal 1E at Jomo Kenyatta International Airport (JKIA) are set to be removed to make way for terminal expansion aimed at boosting capacity immediately. According to a proposal from the private firm tasked with drafting the airport's revamp masterplan, private cars will be temporarily banned from the main terminal area. Only airport taxis and ride-hailing services will access it, while private vehicles must drop off or pick up passengers near the long-term car park—unlike the current setup allowing entry into the circular terminal zone.

The plan also calls for additional check-in and security screening points to cut long queues. It proposes merging Terminals 1B and 1C into a single larger facility for all international departures. With Terminal 1E closing, international arrivals will shift to Terminal 1A, presently used by the national carrier. This will free space to expand the overburdened Terminal 1D, dedicated solely to domestic departures and arrivals.

This opening phase seeks to quickly alleviate strain on current infrastructure, buying time for a new terminal and runway that could lift JKIA's overall capacity to 22.3 million passengers by 2029. The airport now handles 7.5 million passengers yearly, with potential to reach 12 million soon. Presenting the masterplan at a high-level stakeholder forum in Nairobi on February 26, Kenya Airports Authority (KAA) Managing Director Mohamud Gedi stated, “Developed with the global expertise of Dar Al-Handasah, this master plan, together with the JKIA Optimisation Project, provides a clear, resilient and sustainable roadmap for the airport’s long-term growth, fully aligned with Kenya Vision 2030.”

Earlier this month, Principal Secretary for the State Department for Aviation and Aerospace Development, Teresia Mbaika, noted the government would leverage local engineering talent in these multi-billion-shilling expansion projects.

관련 기사

Firefighters extinguish blaze at Lagos airport's old terminal as police helicopter assists; facility reopens after flight diversions.
AI에 의해 생성된 이미지

Lagos airport reopens after fire outbreak, 3 flights diverted

AI에 의해 보고됨 AI에 의해 생성된 이미지

A fire outbreak at the old terminal of Murtala Muhammed International Airport in Lagos led to the diversion of three flights, but the airport has since reopened. Police deployed a helicopter to assist in managing the incident.

Civil Aviation Minister Sameh El-Hefny announced plans to build a fourth passenger terminal at Cairo International Airport to boost capacity and establish it as a regional hub. The ministry has received interest from 68 international companies for managing Hurghada International Airport as a pilot project. He emphasized that Egyptian airports are sovereign assets not for sale, with private sector involvement limited to management and commercial operations.

AI에 의해 보고됨

Twelve days after Prime Minister Narendra Modi inaugurated it, the Noida International Airport terminal gleams with locally sourced red granite floors, ready for passengers. Officials say 80% of construction is complete, with domestic flights possible within 45 days once the Airport Security Program finishes. IndiGo, Air India Express, and Akasa have expressed interest in operations.

니노이 아키노 국제공항에 취항하는 항공사들은 유가 상승과 지역 긴장으로 인해 중동행 항공편이 계속 중단됨에 따라 교통부에 공항 이용료 인하를 호소했습니다. 에릭 이네스 마닐라 국제공항청장은 착륙료와 주차료, 필리핀 민간항공청의 항행료 할인 요청을 확인했습니다.

AI에 의해 보고됨

The R8 billion Cape Winelands Airport project near Durbanville is set to begin construction in late 2026, pending resolution of landowner appeals to the Western Cape environmental minister. The development aims to enhance regional travel, reduce airline fuel costs, and create thousands of jobs. Environmental approvals were granted in October 2025, but concerns over noise and land use persist.

Capital International Airport marked a new milestone on Sunday with the departure of Air Cairo's first flight to King Abdulaziz International Airport in Jeddah, bolstering its role as a strategic hub in Egypt's civil aviation network. The launch forms part of Egypt's state strategy to optimize the use of newly developed airports and strengthen integration within the national air transport system.

AI에 의해 보고됨

PT Jasa Marga reports that Eid 2026 return traffic on the Trans Java Toll Road has begun to ease as of Sunday (March 29). The local Presisi one-way traffic scheme was officially closed at 10 p.m. WIB by Transport Minister Dudy Purwagandhi. Around 2.9 million vehicles have entered Jakarta.

 

 

 

이 웹사이트는 쿠키를 사용합니다

사이트를 개선하기 위해 분석을 위한 쿠키를 사용합니다. 자세한 내용은 개인정보 보호 정책을 읽으세요.
거부