Residents evacuated to hotels after water pipe burst near Cairo Metro station

Egypt's Transport Minister Kamel al-Wazir stated that the safety of citizens and property is a "top priority" during an inspection of the Cairo Metro Line 4 project, following minor ground subsidence at a residential building near the Malek el-Saleh station site. Residents of Building 30 and an adjacent property were evacuated as a precautionary measure after a sudden water pipe burst, and provided accommodation in nearby hotels in the Manial district. The evacuation will continue until soil injection and treatment works are completed to secure the building and the station structure.

Minister Kamel al-Wazir, accompanied by National Authority for Tunnels Chairman Tarek Gewaily, visited the site to monitor emergency technical procedures implemented after a sudden water pipe burst caused minor subsidence at the corner of “Building 30” in the station’s vicinity. Al-Wazir ordered a comprehensive periodic technical report on the results of inspections and measurements. He confirmed that the NAT and the executing companies are committed to the highest safety and quality standards, maintaining full coordination with Cairo Governorate and the Holding Company for Water and Wastewater.

The inspection also covered the broader progress of the first phase of Line 4, which spans 19 km and includes 17 stations. The project, being executed by Egyptian companies under the supervision of international consultants, connects 6th of October City to the El Fustat station in Old Cairo. According to the ministry, four tunnel boring machines (TBMs) are currently active in the first part of phase one. The first machine has reached the Grand Egyptian Museum station, the second is at the Remayah station, while the third and fourth are en route to the Madkour and Talbia stations, respectively.

In the second part of the first phase, assembly is underway for two additional TBMs at El Fustat station. The first is scheduled to begin drilling toward Malek el-Saleh in mid-March, followed by the second machine in mid-April. The Ministry of Transport is also conducting studies for three further phases of the project:
- Phase Two: Extending 26.9 km from El Fustat to New Cairo with 21 stations, intersecting with Metro Line 6 at Sayyeda Aisha.
- Phase Three: A 16.3 km stretch with 10 stations connecting Hadayek al-Ashgar to Al-Hosary Square, linking with the West Nile Monorail.
- Phase Four: Extending 38.7 km with eight stations to reach the New Administrative Capital, providing an exchange service with the Light Rail Transit (LRT) at the Capital Airport station.
Upon completion, the entire line is expected to transport approximately 1.5m passengers per day, according to ministry projections.

Artigos relacionados

Nairobi Water technicians celebrate restored water supply to flood-hit estates after pipeline repairs.
Imagem gerada por IA

Nairobi Water resumes supply to six estates after pipeline repairs

Reportado por IA Imagem gerada por IA

Nairobi Water has confirmed resumption of supply to Buruburu Phases 1 and 2, Kariobangi South and North, Dandora, and parts of Mathare after repairing a flood-damaged transmission pipeline along Outering Road. Services were disrupted by recent floods affecting thousands of homes. The company stated the pipeline has been fully restored.

Deputy Prime Minister for Industrial Development and Minister of Industry and Transport Kamel Al-Wazir conducted an extensive inspection tour to review progress on Egypt's first high-speed train line. The tour focused on the section from 6th of October City to Borg El Arab, emphasizing station construction and civil works. The 660-kilometer line forms a key part of the Sokhna-Dekheila integrated logistics corridor.

Reportado por IA

Minister of Transport Kamel Al-Wazir toured Alexandria to review progress on the rehabilitation and modernisation of the historic Raml Tram, a flagship national project aimed at upgrading urban mobility and easing traffic congestion in the coastal city. The 13.2-kilometre line, comprising 24 stations, will nearly triple its capacity and halve travel time once completed.

Egypt has completed 42 out of 46 planned sanitary landfills as part of its nationwide reform of the municipal solid waste management system, Minister of Local Development and Environment Manal Awad said during a meeting with officials from the Arab Organization for Industrialization. The discussion took place at the ministry's headquarters in the New Administrative Capital.

Reportado por IA

Egypt's Ministry of Electricity and Renewable Energy announced an investment of approximately EGP 26.5bn in fiscal year 2024/2025 to modernize and expand the power transmission network, aiming to boost grid efficiency and integrate renewable energy into the national grid. Minister Mahmoud Esmat reaffirmed the government's commitment to providing high-quality, continuous, and stable electricity while accelerating upgrades to handle growing renewable capacity.

Deputy Prime Minister Kamel Al-Wazir chaired a ministerial meeting that approved three new licences for cement factories, alongside two industrial projects in the Suez Canal Economic Zone worth $1.29bn. The decisions aim to boost production capacity, meet domestic demand, and prepare for regional reconstruction efforts. The projects are set to enter commercial production within one year.

Reportado por IA

Randa El-Menshawy, Egypt’s Minister of Housing, Utilities and Urban Communities, has directed the offering of several seawater desalination plants to specialised local private-sector companies for operation and maintenance. The initiative seeks to improve operational efficiency and sustainability as part of state efforts.

 

 

 

Este site usa cookies

Usamos cookies para análise para melhorar nosso site. Leia nossa política de privacidade para mais informações.
Recusar