NASA sets Artemis III for late 2027 Earth orbit tests

NASA Administrator Jared Isaacman told lawmakers that SpaceX and Blue Origin expect their lunar landers to be ready for the Artemis III mission in late 2027. The mission will now test the landers in Earth orbit rather than attempting a lunar landing. This change aims to reduce risks and increase launch frequency.

NASA Administrator Jared Isaacman informed a House Appropriations subcommittee on Monday that both SpaceX and Blue Origin have confirmed their human landing systems—Starship and Blue Moon—can support an Artemis III rendezvous and docking in late 2027. Previously slated for a lunar landing at the Moon's south pole, the mission has been revised to an Earth orbit demonstration, similar to Apollo 9's lunar module test in 1969. Isaacman stated, “I’ve received responses from both vendors, both SpaceX and Blue Origin, to meet our needs for a late 2027 rendezvous, docking, and test of the interoperability of both landers in advance of a landing attempt in 2028.” The contractors hold multibillion-dollar deals to develop the landers, which require in-space refueling for lunar trips but not for this orbital test. Isaacman highlighted the investments, noting, “The taxpayers are making a very big investment to both SpaceX and Blue Origin’s Human Landing System (HLS) capability.” I’ve also appreciated that both those companies are investing well in excess of that, as well.” Meanwhile, preparations advance at Kennedy Space Center in Florida, where the core stage for the Artemis III SLS rocket arrived Monday via barge from Michoud Assembly Facility in Louisiana. Technicians will soon install a modified heat shield on the Orion spacecraft and address minor issues from Artemis II, such as a helium leak. NASA aims for annual Artemis launches to maintain momentum after Artemis II's success earlier this month.

Связанные статьи

NASA Administrator Jared Isaacman announces delay of first human moon landing to Artemis IV in 2028 during press conference.
Изображение, созданное ИИ

NASA delays moon landing to Artemis IV in 2028

Сообщено ИИ Изображение, созданное ИИ

NASA has overhauled its Artemis program, postponing the first human moon landing until the Artemis IV mission in early 2028. The changes, announced by Administrator Jared Isaacman on February 27, 2026, aim to increase launch frequency and reduce risks after repeated delays with the Space Launch System rocket. An additional test flight, now Artemis III, will focus on low-Earth orbit rendezvous with commercial lunar landers.

NASA is working with SpaceX and Blue Origin to simplify requirements for their Human Landing Systems, aiming for a 2028 moon landing. Lori Glaze, head of NASA's deep space exploration, said both companies have submitted proposals to speed up development by avoiding complex orbits. Officials are analyzing compatibility with the Orion spacecraft.

Сообщено ИИ

NASA has announced major changes to its Artemis program, shifting away from a lunar landing for the next mission in favor of incremental testing steps. The adjustments aim to increase launch frequency and reduce risks following recent setbacks. Officials hope this will lead to moon landings by 2028.

NASA has begun a critical two-day wet dress rehearsal for the Artemis II mission at Kennedy Space Center, simulating launch procedures without engine ignition. The test involves loading the Space Launch System rocket with over 700,000 gallons of propellant and could pave the way for a crewed launch as early as February 8. This marks preparation for the first human trip beyond low Earth orbit since 1972.

Сообщено ИИ

NASA's Artemis II crew—commander Reid Wiseman, pilot Victor Glover, mission specialists Christina Koch and Jeremy Hansen—is in quarantine at Kennedy Space Center, with the Space Launch System rocket returned to the pad after repairs. Launch opportunities open as early as April 1 for the first human lunar trip since 1972, featuring a flyby of the moon's far side.

NASA's Artemis II crew, aboard the Orion spacecraft named Integrity, has successfully departed Earth's orbit and is heading toward the Moon after a key engine burn. The astronauts reported no major issues, shared stunning photos of Earth, and spoke with family and media. The mission remains on track for a closest approach to the Moon on Monday and splashdown on April 10.

Сообщено ИИ

NASA's Artemis II mission has reached day six, with its four-person crew nearing the far side of the moon. The spacecraft remains on track for a lunar flyby while the astronauts share images and videos of Earth. They are also testing systems for future missions and addressing a toilet issue.

 

 

 

Этот сайт использует куки

Мы используем куки для анализа, чтобы улучшить наш сайт. Прочитайте нашу политику конфиденциальности для дополнительной информации.
Отклонить