Desalination plant in Cordova to boost MCWD supply amid El Niño

A desalination plant in Cordova town has started operations to provide additional water to the Metropolitan Cebu Water District as El Niño threatens supply.

The P2-billion plant run by Island Mactan Cordova Corporation aims to deliver 20 million liters of water daily to MCWD. It is currently in the testing phase with interconnections being coordinated.

Vivant Water president Jess Anthony Garcia said the facility is ready and the 25-year contract is in effect. CEO Arlo Sarmiento of Vivant Corporation noted the timing aligns with forecasts for a severe El Niño.

Pagasa has issued an alert for the phenomenon to develop between June and August and last until early 2027. Cebu City officials are also assessing other sources including deep wells.

Verwandte Artikel

Colombian officials presenting energy roadmap for El Niño preparedness with maps and infrastructure visuals
Bild generiert von KI

Colombia activates roadmap with 50 actions for El Niño

Von KI berichtet Bild generiert von KI

The Ministry of Mines and Energy presented a strategy with 50 actions to strengthen the energy system ahead of the El Niño phenomenon expected in the second half of 2026.

The Ministry of Housing urged local authorities and service operators to prepare emergency measures ahead of the likely arrival of the El Niño phenomenon in the second half of the year.

Von KI berichtet

Energy Minister Edwin Palma Egea warned of an imminent risk to electricity supply due to the El Niño phenomenon. In a circular sent on May 14, 2026, to the CREG, he called for urgent regulatory adjustments.

Corpus Christi's main reservoirs are at just 8.4 percent capacity, prompting city officials to warn of a possible water emergency as early as May. The crisis stems from a five-year drought, a failed desalination project, and high industrial water use. Without cuts, supplies for over 500,000 residents could run dry by early next year.

Von KI berichtet

The Department of Environment and Natural Resources has lifted the cease of operations order against the Monterrazas de Cebu project, blamed for extreme flooding during Typhoon Tino last year. The Environmental Management Bureau in Central Visayas said the project proponent, The Mont Property Group Inc., implemented required corrective measures under its Environmental Compliance Certificate. EMB regional director John Edward Ang cited documented remedial works, compliance milestones, and settled penalties under Presidential Decree 1586.

Colombia’s Mines and Energy Minister Edwin Palma defended his handling of the Air-e financial crisis—ongoing since early 2026 with $1.6 trillion in debts—and announced key steps: a targeted $8/kWh surcharge on high-income users, a Creg proposal for more energy contracting ahead of El Niño, and calls for structural reforms in the Caribbean region's electricity sector.

Von KI berichtet

Egypt has signed a memorandum of understanding to develop and build a factory producing seawater desalination membranes using reverse osmosis technology. The deal involves the New Urban Communities Authority, CITIC Construction, and ANCOM. The initiative supports water security and reduces import dependency.

 

 

 

Diese Website verwendet Cookies

Wir verwenden Cookies für Analysen, um unsere Website zu verbessern. Lesen Sie unsere Datenschutzrichtlinie für weitere Informationen.
Ablehnen